essexdecorator.net

  • www.essexdecorator.net

Saturday, 29 September 2012

481_Elliston_Showhouse Shots 01

Since we were last here the designer has been back.
We're rather proud of these rooms.






Friday, 28 September 2012

480_Elliston_MainBed&Ensuite02

 Continuation from last week.
 Door having had the cut hardboard glued and caulked as the other rooms.
Obviously the old paper has been stripped, we've lined (horizontally, of course) and papered.









Then the last day









Friday, 21 September 2012

479_Elliston_MainBed&Ensuite01

The builders had tiled and plastered for us, the company that manufactures sash windows had not long gone and the fireplace had been delivered from Asia. Therefore preparation was underway.


(The first 5 photos being before shots)








Making a start;