The boys room;
Paul made the papering look easy. Thanks mate, you're a star.
...And, do you remember those doors...
The girls room packs a punch. I definitely like the idea behind this.
essexdecorator.net
- www.essexdecorator.net
Thursday, 28 June 2012
Friday, 22 June 2012
468_Elliston
In the middle of doing the kid's rooms.
Just letting you know how we are getting on...
After the front bedroom had been lined the ceiling painted in F&B Wimborne White.
The fireplace was installed (not by us) and the panel doors were hardboarded.
This is the back bedroom, the paper goes on the chimney breast next week. It's gonna look really good, I know it.
Just letting you know how we are getting on...
After the front bedroom had been lined the ceiling painted in F&B Wimborne White.
The fireplace was installed (not by us) and the panel doors were hardboarded.
This is the back bedroom, the paper goes on the chimney breast next week. It's gonna look really good, I know it.
Thursday, 14 June 2012
467_Baker
Billericay, Munster Court...
A kind of Olive green.
They wanted a freshen up with a close match for a paper they liked.
After the emulsion on walls and ceiling, Steve cross lines in prep for the wallcovering.
The carpet is clean by the way, there was just lots of to-ing and fro-ing...
In our 4days work, we also did the downstairs wc, the front and garage doors too.
Just a freshen up....
You can't really see but the plasterer was a bit messy. The previous decorator just left all his splashes untouched. No rubbing down whatsoever. Now, of course, it's as flat as a pancake.
These doors were full of runs and sags. It took 3 hours to rub them back.
Undercoat...
...and the finished article or cle's
A kind of Olive green.
They wanted a freshen up with a close match for a paper they liked.
After the emulsion on walls and ceiling, Steve cross lines in prep for the wallcovering.
The carpet is clean by the way, there was just lots of to-ing and fro-ing...
In our 4days work, we also did the downstairs wc, the front and garage doors too.
Just a freshen up....
You can't really see but the plasterer was a bit messy. The previous decorator just left all his splashes untouched. No rubbing down whatsoever. Now, of course, it's as flat as a pancake.
These doors were full of runs and sags. It took 3 hours to rub them back.
Undercoat...
...and the finished article or cle's
Thursday, 7 June 2012
466_GARDNER
Tyelands Billericay.
Three of us....
Bathroom Ceiling, Hall,Stairs&Landing then the Kitchen.
EMULSIONING ONLY!!!
And the finish....
Three of us....
Bathroom Ceiling, Hall,Stairs&Landing then the Kitchen.
EMULSIONING ONLY!!!
And the finish....
Friday, 1 June 2012
465_RKing
Just a little Kitchen prep Job, they were doing there own decorating after....
Paul lined it for me and he did take a picture or two but I can't seem to find it on the system...
Hmm... a little place in Basildon.
They seemed pleased.
Paul lined it for me and he did take a picture or two but I can't seem to find it on the system...
Hmm... a little place in Basildon.
They seemed pleased.
Subscribe to:
Posts (Atom)